Important information about the change
Tarves
13 The Square , Tarves AB41 7GX
Consultation start date: 14/02/2014
Consultation end date: 14/03/2014
The information letter below tells you more about the change. Please click on the link to download this document.
Traves AB41 7GX – Letter (138kb)
Traves AB41 7GX – Poster (976kb)